MM48

152

Paragraph

13.32 and Policy D3

Modifications proposed as a consequence of the further work requested by the Inspector.

Amend Paragraph 13.32 as follows:

“The Daventry North East SUE allocation is suitable, available and deliverable for at least up to 2,500 2,000 2600 dwellings within the plan period and Policy D3 below sets out the land use requirements for the full 4,000 dwelling development and . The development should commence from the south-western edge and infrastructure provision must be phased accordingly. It is anticipated that the development of the SUE will commence broadly in the south west quadrant of the site.”

Amend the first bullet point of Policy D3 as follows:

  • 4,000 DWELLINGS (2,500 A MINIMUM OF 2,000  2,600 OF WHICH WILL BE PROVIDED WITHIN THE PLAN PERIOD TO 2026 2029);